Post on : January 31, 2024

Motorists are advised that snow removal and/or street widening operations are scheduled from Wednesday, January 31 2024 at 11:00 pm until Thursday, February 1 2024 at 6:00 am, and vehicles must be removed during snow removal operations. To avoid being ticketed or towed, vehicles should be moved from the following 16 streets before the operations begin.

1. Adelaide St (New Gower St to Water St)
2. Bates Hill (Queen’s Rd to Duckworth St)
3. Cathedral St (Gower St to Duckworth St)
4. Church Hill (Henry St to Duckworth St)
5. Cochrane St (Duckworth St to Water St)
6. Duckworth St (Queen’s Rd to Quidi Vidi Rd)
7. George St (Queen St to Water St)
8. Hill O’chips (Duckworth St to Water St)
9. Holloway St (Gower St to Water St)
10. Mcbride’s Hill (Duckworth St to Water St)
11. New Gower St (Barter’s Hill to Duckworth St)
12. Prospect St (Holloway St to King’s Rd)
13. Queen St (New Gower St to Water St)
14. St. John’s Lane (Duckworth St to Water St)
15. Temperance St (Duckworth St to Water St)
16. Water St (Temperance St to Waldegrave St)

For updates, please visit https://map.stjohns.ca/snow.